Isolated Power Network — Island of Mozambique
An 11 kV off-grid network designed, solved by hand, and verified in PowerWorld

What
A standalone 11 kV distribution network for the Island of Mozambique — a UNESCO World Heritage site off the northern coast, with no connection to or dependency on the national grid. Six buses: one slack, two PV (generator) buses and three load buses, carrying 10 MW and 8 MVAr of total demand.
How
Generation was sized around MECCA POWER high-voltage gensets (Cummins G-Drive, 1000–3750 kVA at 11 kV), with buses 2 and 4 modelled at twice the slack-bus generator impedance to represent two machines in parallel at each. Line impedances were derived from typical 11 kV parameters (R = 0.336 Ω/km, X = 0.355 Ω/km) across measured inter-bus spans of 0.5–2 km, converted to per-mile and then per-unit for the simulator.
Bus voltages were solved manually through four Gauss-Seidel iterations, including reactive-power injection updates and voltage-magnitude correction at the PV buses, implemented as a NumPy script. The same network was then rebuilt in PowerWorld Simulator and stepped through the identical four iterations so hand calculation and simulation could be compared directly at each step, followed by a full converged run, power-flow assessment and fault cases.
Outcome
Manual and simulated bus voltages agreed iteration by iteration, converging to a profile inside the acceptable band (roughly 0.979–1.008 pu) and supplying all loads adequately. The topology was designed from the outset with N-1 redundancy: it sustains the island's full demand with any single generator disconnected, verified in simulation for both maintenance and failure scenarios.
Gallery
Click any image to enlarge